Project:
Design of new Crude Fractionation Facilities to process 25,000 BSPD of light crude
Vepica Scope:
Basic and Detail engineering.
Duration:
1 year.
Description:
Project scope included the design of new Crude Fractionation facilities to process 25,000 BSPD of light crude (API 38.2°or API 45.8). The facilities handle single crude streams or a combination of these two feed stocks mixed at any ratio.
Fractionation facilities consisted of an Atmospheric Distillation Unit (ADU) designed to process 25,000 BSPD and to provide products run to storage facilities along with the utilities required to support the proper and safe operation of the process systems.
Engineering Software Used:
- Intergraph
- CADworx
- CADworx Design Review
- CADworx Plant
- CAESAR II
- Isogen
- Navisworks
For more information about this project and the services available to our clients, contact: andres.pulido@vepica.com