EXPERIENCE

Harmattan LP Gas Plant Train 2 Addition

Harmattan LP Gas Plant Train 2 Addition

Harmattan Gas Processing LP (an AltaGas company) expanded their Natural gas liquid (NGL) fractionation capacity at the Harmattan Gas Processing Plant at LSD 09-27-031-04 W5M.

Case Study
Harmattan LP Gas Plant Capacity Expansion

Harmattan LP Gas Plant Capacity Expansion

Harmattan Gas Processing LP (an AltaGas company) expanded their gas processing capacity and CO2 recovery process at the Harmattan Gas Processing Plant at LSD 09-27-031-04 W5M.

Case Study
Husky McMullen TCP Pilot Projects

Husky McMullen TCP Pilot Projects

The project goal was to ignite and burn the residual oil saturation in a depleted gas cap reservoir thereby conducting heat to the underlying bitumen for heavy oil production.

Case Study
Husky 03-600 Compressor Station Project

Husky 03-600 Compressor Station Project

Husky built one common 30 MMSCFD compressor station re-utilizing as much existing equipment as possible from the two adjacent smaller existing plant sites.

Case Study
Athabasca Oil Corp. Oil Batteries

Athabasca Oil Corp. Oil Batteries

The Kaybob, Kaybob East and Saxon oil batteries were fully modularized designs, including pipe racks and interconnecting pipe modules and were completed within a 12-month window from project conception to start-up.

Case Study
Keyera Fort Saskatchewan Facility Expansion

Keyera Fort Saskatchewan Facility Expansion

The project goal was to expand the salt cavern liquids storage and fractionation capacity at this facility.

Case Study
EnCana Corporation Lone Pine Compressor and Dehydration Station Project

EnCana Corporation Lone Pine Compressor and Dehydration Station Project

The project objective was to build a grass roots, sweet gas CBM (Coal Bed Methane) compressor and dehydration station at the Lone Pine Creek area near Linden, Alberta at LSD 01-36-030-26-W4M.

Case Study
Paramount Valhalla 10-25 Sour Gas Plant

Paramount Valhalla 10-25 Sour Gas Plant

The project objective was to build a grass roots 50 MMSCFD sour gas plant in the Valhalla Area of North West Alberta. The project was designed to be executed in three phases.

Case Study
Belize Natural Energy Ltd. Spanish Lookout Field Water Flood Project

Belize Natural Energy Ltd. Spanish Lookout Field Water Flood Project

The project objective was to install a new larger water injection facility to enhance oil recovery in the Spanish Lookout Field by means of expanding their water flood capacity to a total of 10,000 BBL per day.

Case Study
Athabasca Oil Corp. Oil Batteries

Athabasca Oil Corp. Oil Batteries

The Kaybob, Kaybob East and Saxon oil batteries were fully modularized designs, including pipe racks and interconnecting pipe modules and were completed within a 12 month window from project conception to start-up.

Case Study
Mistral Power Inc. Waste Heat Recovery Unit (WHRU)

Mistral Power Inc. Waste Heat Recovery Unit (WHRU)

This project objective was to recover waste heat from the exhaust of pipeline compressor turbine drivers and convert it into electrical power. The project is successfully generating a peak 7 MW of power.

Case Study