• Home
  • Projects
  • A 170 MW capacity thermoelectric plant at Juan Bautista Arismendi

A 170 MW capacity thermoelectric plant at Juan Bautista Arismendi

VepicaOctober 12, 2017

Juan Bautista Arismenti Generation Plant | SCOPE basic and detailed engineering, construction support and inspection for the installation of two turbo generators, with a capacity of 85,4 MW (ISO) EACH, working under simple cycle mode taking future provisions to operate on gas and with an associated steam turbine of 80 MW in combined cycle to reach 250 MW, plus offsite and utilities / CORPOELEC AND EDC / Venezuela